A release readiness checklist to run before every go or no-go

A release readiness checklist is the list a team runs before each release decision to confirm that the evidence for shipping exists: the scope is closed on one named build, the test results are in, every open defect has a decision and a name beside it, the rollback has been tried, and monitoring and support are ready. It ends in a recorded go or no-go. The checklist runs no tests of its own; each line asks whether the evidence exists for the build about to ship.

  • Checklist
  • 9 groups
  • 37 checks
  • Updated

This is a checklist for a software or web release: a new version of a product, a feature going live, a change to a site that is already running. Four lists in this collection are easy to mistake for one another, and what separates them is when each is run. The definition of done is checked on every item as it is finished. The QA checklist is worked through on every build, and its last group records whether that build can ship. The website launch checklist is run once, when a new site goes live. The release readiness checklist is run before each release decision. It takes the QA checklist's answer as one line of evidence, adds what that list does not ask about, such as user acceptance, the support briefing and the monitoring baseline, and the go or no-go is recorded on it.

Watercolour of a weathered wooden mooring post with a loop of burnt orange rope resting on its top

In the checklist

  1. Scope and build 6
  2. Test results 5
  3. Open defects 4
  4. Performance and accessibility 3
  5. Rollback 4
  6. Monitoring and alerting 3
  7. Support and communication 4
  8. Sign-off and the go or no-go 3
  9. Go live, on the day 5

Release readiness checklist, ready to copy

Copy it as it is. There is no email step, and nothing on this page is behind one.

0 of 37 ticked

Scope and build

Test results

Open defects

Performance and accessibility

Only what the team's own written standards require. Delete a line no standard asks for.

Rollback

Monitoring and alerting

Support and communication

Sign-off and the go or no-go

Release and build:

Decided by (one person):

Role:

Date:

Go live, on the day

The checklist below has nine groups and is sized for a small team to run in under an hour, which works only because it produces nothing new. Every line asks for something that should already exist: a result, a list, a rehearsal, a name. A line that cannot be answered from what is in front of the team is a finding in itself. The last group is for the day of the release, after a go, and it is the part to use as a go live checklist.

What each group is for

Scroll the table sideways for the examples.

Group Why it earns its place Example
Scope and build What is in the release, and the one build the evidence under it describes. Every later group is a statement about a build, so a merge made after the name was written down leaves the test results, the defect list and the rollback rehearsal describing something that is no longer shipping. The flag line is there because a change that ships switched off is in the build and outside the release, and both facts matter on the day. The dependency line covers what the team cannot put right by itself: a partner's date, a third party's approval. The configuration line is for what production needs and staging may already have: a setting, a secret, a migration that has to run before the code does. Release 4.8.0: shift swaps, two fixes to the rota export, one dependency update. Release candidate 4.8.0-rc.3, commit a41c9e7. Shift swaps ship behind a flag, on for the six pilot accounts and off for everyone else. The text message provider confirmed the new sender name on Monday. One migration adds the swaps table, and the provider's production key is set.
Test results Results that already exist, read against the build named above: the pipeline, the QA checklist and user acceptance. This group runs no test. It asks whether each result is there, whether it belongs to this build, and what was skipped. The security line asks only for the checks the team's own rules require, such as a dependency scan in the pipeline. The skipped line earns its place because a test that was not run leaves no failure behind, and in a summary it looks the same as a pass. Pipeline green on 4.8.0-rc.3. QA checklist completed on rc.3 on Tuesday, result: ship. User acceptance signed off on rc.3 by the operations manager. Dependency scan clean on rc.3. Two end-to-end tests not run, because the text message sandbox was down.
Open defects Every defect still open, with a decision and a name beside each. The blocking severity the team agreed before the release settles the serious ones in advance. This group is for what is left under that line, where a defect ships because nobody said it should not. Fix first, ship and fix after, and accept are three different promises, and the name records who made which. One major, swap requests shown in the wrong time zone: fix first, decided by the product owner, closed and re-checked on rc.3. Four minors ship, a contrast miss on the pending badge among them. Two are to be fixed in 4.8.1 and two are accepted, each decided by the product owner.
Performance and accessibility optional The checks the team's own written standards require, on what this release changed, and no others. A readiness list is the wrong place to introduce a standard: a line with no budget or rule behind it cannot fail, so it gets ticked. Where the team has a performance budget or names an accessibility standard, the line asks for the measurement. Where it has neither, delete the line, since a missing line is easier to put right later than a tick nobody can explain. Rota page with swaps switched on loads inside the team's budget on the reference phone. Keyboard reach, focus order and contrast checked on the swap dialog. One contrast miss on the pending badge, filed as a minor and decided with the others.
Rollback Which way back applies to this release, proof that it was tried from this build, and the trigger with a name against it. A release can have more than one route: a flag for the flagged change, the previous version for everything else. The trigger is written as a figure somebody can read off a dashboard, so the call on the day is a comparison. Where the release changes data, a backup taken before the release and a restore that has actually been tried are what make the way back real. What the plan itself contains is covered in the glossary under rollback plan. Shift swaps: flag off. Everything else: redeploy 4.7.3. Both run on staging from rc.3 on Wednesday by the on-call engineer. The swaps table is additive, so 4.7.3 runs against it unchanged. Database snapshot scheduled for 09:30 on release day, and a restore from Tuesday's snapshot tried on staging. Trigger: error rate on the rota API above twice its baseline for ten minutes, called by the engineering lead, with the on-call engineer as deputy.
Monitoring and alerting Whether a problem with this release would be seen, and by whom. Three things are asked: the changed paths are on the dashboard, their alerts reach a person who is watching during the release and after it, and the figures from before the release are written down. The baseline is the cheapest of the three, and the rollback trigger depends on it, because a threshold means nothing without the figure it is measured from. Swap endpoints added to the rota dashboard. Their error alert goes to the on-call engineer until Friday evening. Baseline noted at 09:00 on release day: error rate and median response time of the rota API.
Support and communication Whether the people outside the team are ready: support, customers and partners. Support reads the notes before the release, known issues included, and knows where a report about this release goes, so the first ticket is recognised and not investigated from nothing. Customers who have to do something are told, with a date. The status page line is conditional, because a release with no expected interruption needs no notice. Notes drafted with two known issues. Support read them on Wednesday and tags swap reports with the release number. The six pilot accounts were emailed with the date. No status page notice, since no downtime is expected.
Sign-off and the go or no-go Each group's owner reports it green, amber or red, by name, and one person then decides. The decision is written on the checklist itself, against the release and the build, so the evidence and the call are one record. A go lists every item shipped while not green. A no-go lists what stopped it, what would change the answer and when the question is asked again. Who makes the call, and when, is covered in the glossary under go/no-go decision. Go, decided by the product owner on Wednesday at 16:00, for release on Thursday at 10:00. One amber accepted: the two text message tests not run, owned by the QA lead, to be run when the sandbox returns.
Go live, on the day The short list for the day itself, after a go. It confirms that what was approved is what was deployed, that it works in production, and that somebody is watching it against the baseline for a period agreed in advance. Nothing here is new work. Each line closes one opened earlier: the build, the flags, the smoke test, the watch and the notes. Version 4.8.0 confirmed on the health endpoint at 10:05. Swaps flag on for the six pilot accounts only. Smoke test passed at 10:12. Dashboard watched until 12:00 by the on-call engineer. Notes published at 10:30 and support told.

A release readiness check anybody can tick, and the same check as evidence

Not this

[ ] Monitoring set up

This instead

[ ] The monitoring dashboard shows the paths this release changes
[ ] Alerts on those paths reach a named person through the release and the watch period
[ ] Error rate and response time are noted before the release, as the baseline

Both ask the same question. The first can be ticked by anybody who knows the product has a dashboard, and it was just as true of the last release, which is the sign that it checks nothing about this one. The second asks for three things that can each be shown: the changed paths on the dashboard, an alert that reaches a person by name, and the figures from before the release written down. The third is the one the short version never asks for, and the rollback trigger cannot be read without it.

A release readiness checklist reads evidence and produces none

The testing happened on the QA checklist and in user acceptance. The rollback was rehearsed on staging. The notes were written as the work was finished. What this list adds is one sitting in which somebody asks for each of those by name and looks at what comes back. That is why it can be short. Test results is four lines because it asks whether three results exist for the named build and what was skipped, and it leaves the checks behind those results on the lists where they were made. It is also why the list is opened when the release is scoped and only read at the end: an owner who learns on the morning of the decision that a rehearsal was expected cannot produce one in an hour. Who supplies which evidence is covered in the glossary under release readiness. Run this way, any line has two possible answers. The evidence exists and belongs to this build, or it does not, and the second answer is information the decision needs.

One named build, or the evidence describes something else

Every group after the first is a statement about a build. The pipeline was green on it, the QA checklist was completed on it, the rollback was run from it. The first group therefore fixes two things before anything else is read: the list of changes, closed to additions, and one build named by version or commit. It also asks that anything the release depends on outside the team is confirmed, since that is the one kind of gap nobody in the room can close on the day. A change merged after the build is named does not so much add to the release as replace its subject, because the build that will ship is now one no result describes. The checklist gives that change two exits. It is re-tested, which means a new build is named and the results are read again against it, or it waits for the next release. A fix for a defect marked fix first goes through the same door. Flags get a line of their own because a flagged change is in the build whether or not it is in the release. Listing the state each flag ships in tells support what users will see, and it tells whoever runs the last group what to confirm on the day.

Every defect that ships has a decision and a name beside it

A release goes out with defects open, and the question this group asks is whether each one was chosen. The blocking severity the team agreed in advance settles the serious ones without a discussion. What is left is everything under that line, and a defect under the line ships by default unless somebody says otherwise. So each one gets one of three decisions. Fix first holds the release until the fix is in the named build. Ship and fix after is a promise with a target release on it. Accept means nobody plans to fix it, said out loud. The name beside the decision belongs to whoever can make that promise for the product, the product owner on a small team, and not to whoever found the bug. The last line of the group turns the list into something users can read. A defect that ships is a known issue, and writing it in the user's words before the release is what lets support recognise the first report of it. Performance and accessibility misses are decided the same way and on the same list, so the release has one place where its accepted shortcomings are written down.

The rollback trigger and the monitoring baseline are one check in two groups

Rollback and monitoring sit in separate groups because different people own them, and each depends on the other. A trigger is a signal and a threshold: this error rate, above this level, for this long. The threshold is measured from somewhere, and that somewhere is the baseline the monitoring group asks for, noted before the release while the old version is still serving. Without the baseline, the first hour after a release goes on arguing about whether a figure is high. With it, the person named to call the rollback compares two figures. The rehearsal line asks for a run from this release candidate and not from an earlier build, since a migration added last week is the thing an older rehearsal never met. Where a change is behind a flag, switching the flag off is its way back and the redeploy covers everything else, so a release can list two routes with a trigger for each. A release that reaches users in stages reads the same trigger at each stage, and how the stages are chosen is covered in the glossary under phased rollout.

The go live checklist is the short part, because the decision is already made

The last group, Go live, on the day, has five lines, and none of them asks for new work. The build deployed is confirmed to be the one named at the top, by reading its version in production. The flags are in the states the first group listed. A smoke test passes on the paths the release changed. Somebody named watches the dashboard against the baseline for a period agreed before the release. The notes are published and support is told. The phrase go live checklist is also used for ERP and other system implementations, where going live is a project of its own, with a data migration, user training and a cutover plan. The group here is for a software or web release, where the day is short because the readiness work came first. Reports from users arrive during the watch period as well, and they are read next to the dashboard. A feedback widget on the page sends each one with its context: console logs, network activity, page url, viewport and browser travel with the report, where capture settings, browser support and performance budgets allow. The release is finished when the watch period ends, and the checklist, with its ticks and its decision, is filed with the release.

Common questions

What should a release readiness checklist include?

A release readiness checklist should include the scope and the one build being released, the production configuration and data migrations it needs, the test results and required security checks for that build, every open defect with a decision and a name, the performance and accessibility checks the team's own standards require, a rollback that has been tried with a backup of any data the release changes, monitoring with a baseline, support and customer communication, and the recorded go or no-go. The checklist on this page adds a short group for the day of the release.

What is a go live checklist for a software release?

A go live checklist for a software release is the short list run on the day, after the decision to ship: confirm the build deployed is the one that was approved, check each feature flag, run a smoke test in production, watch the dashboard against the baseline for an agreed period, then publish the release notes and tell support. The same phrase is used for ERP and other system implementations, where going live is a migration with a cutover plan of its own. The last group of the checklist on this page is the software version.

How long should a release readiness checklist take to run?

The checklist on this page is sized for a small team to run in under an hour, and that depends on the evidence existing before the run starts. Each line is answered by pointing at a result, a list or a rehearsal. A run that takes much longer is doing the work the lines ask about, which is a sign the list was opened too late. Open it when the release is scoped, so each owner knows what will be asked for.

Does the whole release readiness checklist have to be run again after a no-go?

Green items are not argued again. What is read again is any evidence tied to the build. If turning the red item green produced a new build, the release candidate named at the top changes, and the test results, the open defects and the rollback rehearsal are read against the new one, since their evidence described the old build. Groups that do not depend on the build, such as the support briefing, stand as they were.

Does a team that deploys every day need a release readiness checklist?

A team that deploys many times a day should not run the whole list for each deployment. The lines a pipeline can evaluate become quality gates on every change, and rollback, monitoring and alert routing become standing arrangements that are tested on a schedule. The checklist is kept for the moments that still involve a decision: switching a flagged feature on for users, a data migration, or a change customers have to be told about beforehand.

What do green, amber and red mean on a release readiness checklist?

Green means the evidence exists and belongs to the build being released. Amber means it exists with a known gap, such as a test not run for a stated reason or a notice drafted and not yet approved. Red means the evidence is missing, has failed or describes an earlier build. The colours are each owner's report. The go or no-go is one person's judgement on them, and anything shipped while not green is written into the decision as an accepted risk with an owner.

Is a software release checklist the same as a release readiness checklist?

Software release checklist is the wider name. It can cover a release from scoping to the announcement, including the steps of the deployment itself. A release readiness checklist is the part run before the decision, and it asks whether the evidence for shipping exists. The checklist on this page covers readiness and adds a group for the day of the release, so a small team can use it as its software release checklist and keep the deployment steps in the pipeline, where they run the same way each time.

What is the difference between release readiness and production readiness?

Release readiness asks whether the evidence for shipping this build exists. Production readiness, as TechTarget's checklist frames it, asks two questions: is the build ready for production, and is production ready for the build. The second covers infrastructure, dependencies, service levels and operational support, and an operational readiness checklist is usually that second half. The checklist on this page touches it through configuration, rollback, monitoring and support, and leaves capacity and infrastructure to the team that owns them.

Is a deployment checklist the same as a release readiness checklist?

A deployment checklist covers getting the code into production safely: verified dependencies, environment parity, backups, configuration and secrets, the release strategy, and monitoring afterwards, as in Octopus Deploy's 16-step list. A release readiness checklist is the decision before that: whether this build should ship at all, with a recorded go or no-go. Most deployment steps belong in the pipeline, where they run the same way each time, and this checklist asks whether that pipeline was green on the named build.

What are the stages of a software release?

Names vary by team, but a common sequence is development, an internal or alpha build, a beta for a wider group, a release candidate, and general availability, followed by patches. The release readiness checklist runs at the release candidate stage, because that is the build the evidence is gathered on and the build that ships if the answer is go. Teams that deploy continuously compress the stages into flags and staged rollouts.

Can I use this release readiness checklist in Excel or a spreadsheet?

The checklist copies as plain text, one line per check, so it pastes into a spreadsheet as one row per line. Add three columns: the owner, the status as green, amber or red, and a link to the evidence. Keep one sheet per release, named with its version, so the decision and the evidence it rested on stay together after the release.

More templates

  • Watercolour of a paper plane climbing, a burnt orange wash breaking up in its wake

    Checklist

    Website launch checklist

    A website launch checklist covering the checks that actually block a go-live: functionality, cross-browser, forms, analytics, redirects, and rollback.

    11 groups · 40 checks ·

  • Watercolour of a hand lens lying flat, a pool of moss green gathered under the glass

    Checklist

    QA checklist

    A QA checklist for a release: what to verify before a build leaves the pipeline, who signs each item, and which failures block the release outright.

    8 groups · 28 checks ·

  • Watercolour of a fountain pen nib, one dark drop of ink swelling at its tip

    Checklist

    UAT checklist and sign-off

    A copyable UAT checklist and sign-off template: what to confirm before the window opens, how to record each scenario and finding, and what sign-off states.

    5 groups · 24 checks ·

Or skip the template and capture the fields automatically.

Environment, console and network attach themselves, on the free plan.

<script src="…/widget.js" data-key="pb_pub_…">