A feature request asks a product for behaviour it never promised, and many of them arrive through a feedback widget or a bug tracker filed as bugs. Sort each report against the acceptance criteria and the approved design first. A defect gets fixed, a change gets priced, and a request gets written up, ranked and answered.
A bug form is the only door most reporters can find
A person using a website or a web app usually sees one button, labelled “Report a problem” or “Feedback”. When the product lacks something they need, the gap feels like a fault, because they tried to do a thing and could not. So the report says “the export is broken” when the export works and only produces a PDF, or “the filter does not work” when the filter was never built to combine two options. Filed through the bug tracker, it joins the defect queue with a severity attached.
Most guides to feature requests start after that moment. They describe a request that arrives as a request, through a portal or a form built for ideas, with a title, a use case and a vote count. On a site with a feedback widget the request turns up in the fix queue instead, worded as a complaint, and the first job is to notice it.
The label the reporter picked records how they felt. The class is decided by whether the behaviour contradicts a written expectation, the definition argued in bug vs feature is settled by what was written down. This post takes that definition as given and covers what comes after it: the sorting, the write-up, the log and the answer.
The mistake costs something in both directions. A disguised request fixed as a bug ships new behaviour with no decision behind it, chosen by whichever developer picked up the ticket. A real defect parked as an idea leaves a broken page in place and sends the reporter a thank-you for their suggestion.
Sort every report into defect, change or request
Read the report against two documents: the acceptance criteria for the part of the product it concerns, and the approved design. Three answers are possible.
- Defect. The build does not do what a criterion or the design says. A crash, an error or lost data is a defect without any document.
- Change. The build does what was agreed, and the reporter wants the agreement itself altered while a client project is still running. A change amends a commitment, so it goes through a change request with its cost and its effect on the launch date.
- Request. The build does what was agreed, and the reporter wants the product to do something more. Nobody is owed it by a date, and it enters a backlog to be weighed against other ideas.
The same sentence can be a change or a request depending on who sends it. From a client during a build, “the filters should remember my choice” alters an agreement in force. From a user of a live product, it is a request. On a client build, pricing the change is the subject of how to avoid scope creep one comment at a time. This post follows the third class.
| The report as filed | What the documents say | Class | Where it goes |
|---|---|---|---|
| “Export to CSV is broken” | A criterion says the export produces a PDF of the table | Request | The request log, rewritten as a problem |
| “The export button does nothing in Safari” | A criterion says the export downloads a PDF, and Safari is on the supported list | Defect | The fix queue, with a severity |
| “Search results should show the price” | The approved design shows a price on every result, and the build omits it | Defect | The fix queue |
| “Can the filters remember my choice?” | The criteria are silent, and the design shows filters resetting on reload | Request on a live product, change on a running build | The request log, or a change request |
| “Please add a dark mode” | Neither document mentions a theme setting | Request | The request log |
The first row is worded like a fault and is a request. The third is worded like a wish and is a defect. Wording does not predict the class, which is why the sorting needs a person with both documents open. Where neither document settles a report, it is a question, the fourth case the scope-creep post names, and it waits for whoever owns the product’s behaviour to decide before it is sorted like any other. Notarus does not make this call. A person reads the documents and decides.
Each class gets a different next step and a different reply
Sorting is only useful if each class then leaves the queue it arrived in. A request left among the bugs inflates the defect count, gets reopened as “still broken”, and is eventually fixed by somebody who never asked whether the product should do it.
| Class | Next step | Who decides | What the reporter hears |
|---|---|---|---|
| Defect | Severity and priority, a fix, a retest | The delivery or engineering lead | “That is broken, and we are fixing it.” |
| Change | A written change request with its cost and its effect on the date | The client’s approver, with the delivery lead | “That alters what we agreed. Here is what it costs.” |
| Request | A write-up with the template below, merged with duplicates, then ranked | The product owner | “That is a request. Here is where it sits and when we will look at it again.” |
The reply matters as much as the move. A reporter who wrote “broken” and hears nothing assumes nobody looked. A reporter told “that is a request, and here is why” has learned where the product’s edges are, and the next report is more likely to be worded as one. On the Notarus board, every widget report enters the first status as its own ticket, and the team writes public or internal replies, with reply templates, so the answer for each class is written once and reused.
A feature request template needs four fields
Most request forms open with a field for the requested feature, which invites the reporter to design the solution. Their suggestion is worth keeping, and it belongs inside the write-up as a quotation. The fields name the problem, because the team may solve it another way. A person asking for a CSV export may be best served by a link that opens the table in a spreadsheet.
Title: the problem, in the reporter's terms
Problem: what the person was trying to do, and where they got stuck
Who: which users or clients hit it, and how often you know of
Current workaround: what they do instead today, and what it costs them
Evidence: the original report, the page, a screenshot, linked duplicates
Requested by: names or accounts, so each can be told when the decision moves
Four of those lines carry the decision: problem, who, workaround and evidence. The workaround is the field most templates leave out and the one that says most about urgency. A workaround that is a small annoyance can wait. One that has people retyping data by hand, or exporting it to a competitor’s tool, cannot. The list of requesters is what lets the team answer each of them later.
Here is the first row of the earlier table, written up. The report said “Export to CSV is broken”.
Title: Account managers cannot get the invoices table into a spreadsheet
Problem: They reconcile invoices in a spreadsheet. The export only
produces a PDF, so they copy rows across by hand.
Who: Account managers at one client so far, through the widget
Current workaround: Copying rows from the PDF, which introduces typing errors
Evidence: The original report, a screenshot of the invoices page, its URL
Requested by: The reporter, named on the original ticket
The evidence field is easier to fill when the report was filed on the page itself. A report sent through the Notarus widget arrives with a capture of the page the reporter was looking at, and the page URL, viewport and browser travel with it, as far as capture settings and browser support allow. For a request, that shows where in the product the gap was felt, which is often more useful than the reporter’s description of the fix.
Feature request management is one log, merged and ranked
Requests come through every door: the widget, support email, sales calls, review rounds and survey follow-ups. A rating question followed by “what should we change?” collects requests by design. They all go into one log, whatever door they used, including the ones first filed as bugs and moved out of the fix queue.
Three habits keep that log usable.
- Merge duplicates into one entry. Add each new requester to the entry’s list and link their original report as evidence. The entry grows heavier, and the log stays readable.
- Treat the count as evidence. The number of people asking says how widespread a problem is. It says nothing about the cost, the fit with the product, or whether one quiet client matters more than ten loud users. The product owner ranks the entries against goals and cost, and the count is one input.
- Review on a schedule, and give every entry a status. An unreviewed log fills with requests nobody has read, and its requesters stop writing in.
On a client build, requests raised during review rounds can go into a phase-two list agreed with the client, which keeps them out of the current scope without losing them. Separating requests from defects is easier when the request for feedback asks for one kind at a time, as how to ask clients for feedback they can act on sets out.
No and later are answers the reporter can use
Every entry in the log ends in one of three statuses, and each one is written down with its reason.
| Status | What it commits to | A reply that works |
|---|---|---|
| Planned | The request is in a release the team has scheduled | “This is planned. We will tell you when it ships.” |
| Later | The request is parked until a named condition is met | “We will look at this again when we rebuild the reporting area.” |
| Not planned | The request will not be built, for a stated reason | “We are not adding a dark mode, because a second theme would add a second design to review on every page. Here is the browser setting that gets close.” |
“Later” is the status that goes wrong. Without a condition attached it means never, and the requester eventually works that out. A condition, such as a rebuild of the area, a second client asking, or a change in the product’s direction, turns it into a decision the team can act on when the condition arrives.
A refusal with a reason is still a request handled. The requester learns where the product is going, and the log entry answers the next person who asks the same thing in the same words. When the request stays a ticket on the board, the reporter sees its status change from their portal link, so the answer reaches them without anyone having to remember to send it.