A release notes template, with a filled-in example

A release notes template is a fixed set of sections a team fills in for each release: a headline with the product, version and date, a two-line summary, breaking changes and changed behaviour with what the reader must do, what is new, improved and fixed, known issues, and where to report a problem. Every entry is written for the people who use the product, in the words they see on screen. The summary says in one line whether anyone has to act.

  • Template
  • 8 fields, explained
  • Updated

Release notes are read in a hurry by people who did not build the product: a customer who has just found a button moved, a support agent with a ticket open, a colleague about to give a demonstration. The template below gives them the same sections in the same order on every release, so a returning reader knows where to look, and whoever writes the notes is filling in a form instead of designing a page.

Watercolour of a small brass hand bell standing upright, its wooden handle washed in burnt orange

In the template

  1. Summary
  2. Breaking changes and changed behaviour
  3. New
  4. Improved
  5. Fixed
  6. Known issues
  7. Report a problem

Release notes template, ready to copy

Copy it as it is. There is no email step, and nothing on this page is behind one.

Which version of the artefact to show
# Release notes: [product] [version], [release date]

## Summary
Two lines for somebody who reads nothing else: the changes most readers will notice.
How this release reaches you:
Action needed (who, what and by when, or None):

## Breaking changes and changed behaviour
One block per change, or the single line: None in this release.
What changed:
Who is affected:
What you need to do, and by when:
If you do nothing:

## New
What you can now do, and where to find it. One entry per capability.
-
-

## Improved
What already existed and now works better, named as it appears on screen.
-
-

## Fixed
The symptom that is gone, in the words of somebody who met it, and what happens now.
-
-

## Known issues
One block per issue, or the single line: None that we know of.
Issue, and who meets it:
Workaround:
Fix expected:

## Report a problem
Where to report it:
What to include:
# Release notes: Timesheets 4.0.0, 13 October 2026

## Summary
You can now start a week by copying the one before it, and an approved week is locked, so the hours behind an invoice cannot change afterwards.
The weekly export file has a new layout, which matters only if you import that file somewhere else.
How this release reaches you: automatically. Everyone has it from Tuesday 13 October, with nothing to install or switch on.
Action needed (who, what and by when, or None): anyone who imports the weekly export into payroll software or a spreadsheet updates that import before 1 December 2026. The next section says how. Everyone else: None.

## Breaking changes and changed behaviour
What changed: the weekly export file has a new layout. It has one row per time entry, where it had one row per person per day, and the column Hours is replaced by Duration, in minutes.
Who is affected: anyone who imports the file into payroll software, or opens it in a spreadsheet with formulas built on the old columns.
What you need to do, and by when: change the import or the formulas to read Duration. The old file stays available under Export, Classic layout until 30 November 2026.
If you do nothing: from 1 December 2026 the Classic layout is removed. An import built for it will then fail, or will read minutes as hours.

What changed: an approved week can no longer be edited by the person who submitted it.
Who is affected: anyone who corrects their hours after a manager has approved them.
What you need to do, and by when: ask the approver to press Reopen on the week, make the correction and submit it again. Nothing needs doing in advance.
If you do nothing: nothing is lost. Weeks approved before this release keep their hours and are now locked.

## New
- Copy last week. On an empty week, press Copy last week to bring across the same projects and hours, then change what differs. The button is at the top of the Week view.
- Lock on approval. When a manager approves a week, its entries can no longer be edited. The week shows a padlock and the name of the person who approved it.
- Friday reminder. Anyone who has not submitted their week gets one email at 15:00 on Friday, in their own time zone. A manager can switch it off for a team under Settings, Reminders.

## Improved
- The Week view loads all seven days at once, so moving from one day to the next no longer waits.
- The project picker lists the five projects you logged time against most recently at the top.
- An approval email now gives the total hours and the number of projects in its subject line.

## Fixed
- Entries made just after midnight were saved to the previous day for people in time zones ahead of London. They are now saved to the day shown on screen.
- The total at the foot of the Week view left out entries shorter than fifteen minutes. It now counts them, and the totals of past weeks have been corrected.
- Pressing Submit twice in quick succession sent two approval requests. It now sends one.

## Known issues
Issue, and who meets it: Copy last week leaves out entries on a project that has since been archived, and does not say that it skipped them. It affects anyone whose previous week included an archived project.
Workaround: add those hours by hand, to a project that is still open.
Fix expected: version 4.0.1, planned for the week of 26 October.

Issue, and who meets it: in Safari on an iPad held upright, the padlock on a locked week is drawn over the week's total.
Workaround: turn the iPad on its side, where the two no longer overlap.
Fix expected: version 4.0.1.

## Report a problem
Where to report it: the Feedback button at the bottom right of every page.
What to include: the version shown under Help, About, which for this release is 4.0.0, the page you were on, what you did and what you expected to happen. A screenshot helps.

It is one release's notes: a headline and seven sections, sized so a small team that kept a line on each finished item can fill it in in about ten minutes. The filled-in version is the same template written for version 4.0.0 of a timesheet web app, so each section shows how specific an entry has to be before a reader can act on it.

This page is the structure, with every field explained. A changelog is a different document: it is the running record of every notable change, one line each, kept with the code for developers and integrators, while release notes are written once per release for the people who use the product. What makes a single entry work is argued separately, with annotated examples, in this site's post on release notes examples.

What each field is for

Scroll the table sideways for the examples.

Field Why it earns its place Example
Product, version and release date The headline says which release the notes describe: the product, the version a user can see in it, and the date the release reached them. A reader checks it against the version shown in the product before reading on, and a report that quotes it tells support which release it is about. A product with no visible version number uses the date as the identifier. Release notes: Timesheets 4.0.0, 13 October 2026
Summary Two lines for the reader who stops here, then two facts every reader needs: how the release reaches them, and whether they have to do anything. Two lines force a choice about which changes lead. The action line is filled in on every release, with None when that is the answer, so a reader never has to work out what a missing line means. You can now start a week by copying the one before it, and an approved week is locked. Reaches you automatically. Action needed: anyone who imports the weekly export updates that import before 1 December 2026.
Breaking changes and changed behaviour Every change that makes something the reader relied on stop working or work differently, in four lines: what changed, who is affected, what to do and by when, and what happens to a reader who does nothing. The fourth line is what gives the date its weight. The section sits ahead of the features because it is the only one with a deadline in it. In a release with no such change it stays and reads None in this release, so the reader can see the question was asked. What changed: the weekly export has one row per time entry. Who is affected: anyone who imports the file. What to do: change the import to read Duration, before 1 December 2026. If you do nothing: the import fails, or reads minutes as hours.
New optional What the reader can do now and could not do before, one entry per capability: a name, what it lets them do, and where to find it. The place earns its half of the entry, since a feature the reader cannot find has not been announced to them. The entry that affects the largest number of readers goes first. Delete the section in a release that adds nothing. Copy last week. On an empty week, press Copy last week to bring across the same projects and hours, then change what differs. The button is at the top of the Week view.
Improved optional Something that already existed and now works better, named as it appears on screen. Keeping it apart from New lets a reader looking for a new button skip it, and stops a faster page being announced as a feature. Say what is better in terms the reader can check: what no longer waits, or which step has gone. Work with no visible effect has no entry. The Week view loads all seven days at once, so moving from one day to the next no longer waits.
Fixed optional The symptom that is gone, in the words of somebody who met it, followed by what happens now. The reader knew the fault by what they saw and never by its cause. Where a fix also corrected stored data, the entry says so, because the reader may have acted on the wrong figure and needs to know it has moved. The total at the foot of the Week view left out entries shorter than fifteen minutes. It now counts them, and the totals of past weeks have been corrected.
Known issues What is still wrong in this release and was shipped knowingly: the fault and who meets it, a workaround, and when a fix is expected. A reader who meets the fault learns that it is known and how to get past it, and support recognises the first report of it. Give a version or a date for the fix where there is one, and write No date yet where there is not. Copy last week leaves out entries on a project that has since been archived. Workaround: add those hours by hand. Fix expected: version 4.0.1, planned for the week of 26 October.
Report a problem Where a reader sends a problem with this release, and what to send with it. Asking for the version from the headline, the page and what was expected saves a first reply that asks for them. One route is enough, and it has to be one that somebody reads on the day of the release. The Feedback button at the bottom right of every page. Include the version shown under Help, About, the page you were on, what you did and what you expected to happen.

A breaking change in release notes that nobody can act on, and the same one they can

Not this

Updated the format of the weekly CSV export.

This instead

What changed: the weekly export file has one row per time entry, where it had one row per person per day, and the column Hours is replaced by Duration, in minutes.
Who is affected: anyone who imports the file into payroll software, or opens it in a spreadsheet with formulas built on the old columns.
What you need to do, and by when: change the import or the formulas to read Duration. The old file stays available under Export, Classic layout until 30 November 2026.
If you do nothing: from 1 December 2026 an import built for the old file will fail, or will read minutes as hours.

Both announce the same change, and the first is accurate. What it leaves out is everything a reader would act on: which export, what is different about it, whether they are among the people affected, and how long they have. A payroll import that reads minutes as hours is discovered on pay day, by somebody who never saw the note. The second version is four lines long, and the only reader who has to study it is the one it names in its second line.

The summary is written for the reader who stops there

The summary has four lines, and each has a job. The first two say what changed for the largest number of readers, in sentences a person could repeat to a colleague. They are easiest to write last, once the sections below show what the release contains. The third line says how the release reaches the reader: by itself, by an update they install, or to some accounts before others. Where a change is switched on in stages, that line says who has it today, because a note describing a button the reader cannot find yet sends them to support. The glossary entry on release vs deployment covers why the day the code went out and the day a reader gets the change can differ. The fourth line is the one no release leaves blank. Action needed is either None or a short statement of who has to do what, and by when, pointing at the section directly below it. A reader who sees None can close the page knowing nothing was asked of them.

Breaking changes and changed behaviour come second, in four lines each

A breaking change is one after which something the reader built or set up stops working until they act: an import, a saved link, an integration. Changed behaviour still works and works differently, so what breaks is a habit. Both go in this section because both need the same four answers, and the section sits directly under the summary, ahead of the features, because it is the only one with a deadline in it. What changed, in the reader's words. Who is affected, drawn narrowly enough that everyone else can stop reading. What to do and by when, with the date written out. What happens to a reader who does nothing, which is the line that tells them how seriously to take the date. In the filled-in example the export file has a new layout, the old one stays available until 30 November, and the fourth line says what an unchanged import will do from 1 December. One change can appear twice in the same notes. Locking a week on approval is under New for the manager who gains it, and under this section for the person who can no longer correct an approved week, because the two are different readers looking in different places. A feature that still works and is going to be removed belongs here too, from the first release that announces its removal, because the removal date is a deadline. The Good Docs Project's template asks a deprecation notice for the feature's name, what replaces it, the date it is removed and what readers must do to keep their data, which are the same four lines under other names. The Classic export layout in the filled-in example is one: it works until 30 November, and the notes say what replaces it. Where a release has no such change, the section stays in the notes as one line: None in this release.

New, improved and fixed are sorted by what the reader had before

The three sections answer one question each. New is for what could not be done before this release. Improved is for what could be done and is now quicker, clearer or a step shorter. Fixed is for what was wrong and is now right. Sorting by that test puts each entry where its reader looks, which sorting by the size of the work or by the team that did it never does. Within a section, the entry that affects the largest number of readers comes first. The Good Docs Project's guide to its own release notes template gives the same advice for new features: list first those with the most impact on the stakeholder's experience. That template uses a comparable run of sections, among them new features, improvements, bug fixes, known issues and an optional deprecation notice. Its high-level summary is optional, where the template on this page asks for a summary on every release. A fixed entry describes the symptom, then what happens now, and mentions any data that was corrected. A fix for a regression, meaning something that worked in an earlier version and then stopped, is worth marking with the version where it broke, since the readers who noticed are looking for that line. Work that changed nothing a reader can see has no entry.

Known issues arrive from the release decision, already worded

The known issues section is the one part of the notes that should need no writing on release day. A defect that ships was looked at before the release, and somebody decided it could go. That decision is the moment to word it for users. The release readiness checklist in this collection has a line for exactly that, and the list it produces is pasted here. Each issue gets three lines. The first says what goes wrong and who meets it, so a reader can tell whether it is the fault in front of them. The second gives a workaround, or says plainly that there is none. The third says when a fix is expected: a version, a date, or No date yet. When the fix ships, the Fixed section of that release describes the fault in the same words, so a reader who has been living with the workaround recognises the entry. An issue found after the notes are published is added to them, with the date it was added. The notes are the page support links to, and a list that stops on release day is out of date by the first report.

Report a problem says where to send it, and what to send

The last section turns a reader who has hit a problem into a report somebody can act on. It names one route and lists what to include: the version from the headline, the page, what the reader did and what they expected. Those are the facts a first reply would otherwise have to ask for. Where the product has a feedback widget on the page, the reader can report from the screen where the problem happened, and console logs, network activity, page url, viewport and browser travel with the report, where capture settings, browser support and performance budgets allow. A report that turns out to be a known issue is answered with the workaround already written in the section above. A report serious enough to need an urgent fix leads to a patch release with short notes of its own: the headline, the action line, one Fixed entry and the known issues that remain. The glossary entry on hotfix vs bugfix covers when a fix is urgent enough to ship that way.

Filling in the release notes template in ten minutes

Ten minutes is the time it takes to sort and edit lines that already exist. Remembering a fortnight of work takes far longer and leaves things out. The lines come from the items themselves: when a story or a fix is finished, the person who did it writes one sentence about it in the user's words, on the ticket. The definition of done template in this collection makes that sentence a condition of every item, under Handover. On release day the owner of the notes collects the lines and sorts each into New, Improved or Fixed, deleting any that describe nothing a reader can see. Changes to existing behaviour are lifted out into four-line blocks. Known issues are pasted from the release decision. The summary is written last, from what is now on the page, and the action line is checked against the breaking changes section so the two agree. Support reads the draft before it is published, since support will be asked about every line of it. Publishing waits until the release is confirmed live, so the notes never describe something a reader cannot yet see.

Common questions

What should a release notes template include?

A release notes template should include a headline with the product, version and release date, a short summary with a line saying whether the reader has to act, a section for breaking changes and changed behaviour, sections for what is new, improved and fixed, known issues with their workarounds, and where to report a problem. The summary and the breaking changes section are the two a reader can least afford to miss.

What is a good format for release notes?

A good format for release notes keeps the same headings in the same order on every release, so a returning reader knows where to look: a headline with the product, version and date, a summary with an action line, breaking changes, then New, Improved and Fixed, known issues and where to report a problem. Each entry covers one change, written in the words the reader sees on screen.

How long should a full set of release notes be?

A set of release notes should be as long as the list of things a reader will notice, with two or three sentences an entry. The filled-in example on this page covers three new features, three improvements, three fixes, two changes in behaviour and two known issues in about forty lines. When a release outgrows that, the summary carries more of the load and the detail moves to the help pages the entries point at.

Where do breaking changes go in release notes?

Breaking changes go in a section of their own, directly under the summary and ahead of the new features, and the summary's action line says to whom the section applies. Each one states what changed, who is affected, what to do and by when, and what happens otherwise. A breaking change mixed into the list of improvements is missed by the one reader who had to act on it. In a release with none, the section stays and says so in one line.

Where do deprecated features go in release notes?

Deprecated features go in the breaking changes and changed behaviour section from the first release that announces their removal, because a removal date is a deadline. The entry names the feature, what replaces it, the date it is removed and what readers must do to keep their data or their way of working. The notes of the release that finally removes the feature repeat the entry, since some readers only look then.

How should a security fix appear in release notes?

A security fix appears under Fixed, or under a Security heading of its own when a release carries several, and the summary's action line says whether readers have to update or change anything. The entry says in plain terms what was exposed and to whom. Detail that would help somebody exploit the fault can wait until readers have had time to update, and the entry links to a full advisory once one exists.

Which bug fixes belong in release notes?

A bug fix belongs in release notes when a user could have met the fault: a wrong total, a button that did nothing, a page that failed in one browser. The entry describes that symptom and what happens now. A fix for a fault no user could see stays out, and so does a fix for a defect that was introduced and caught inside the same release, since no reader ever had the broken version.

What version number goes in the headline of release notes?

The headline carries the version a user can see in the product, so that the notes and a bug report refer to the same thing. Semantic Versioning 2.0.0 requires the major number to be incremented when a backward incompatible change is introduced to the public API, so on a product that follows it, a new first number tells an integrator to read the breaking changes section before anything else. A web product with no visible version number uses the release date.

What do release notes look like when a release only fixes bugs?

Release notes for a release of fixes keep the headline, the summary, Fixed, known issues and where to report a problem, and drop New and Improved. The summary can be a single line. For an urgent patch that corrects one fault, the whole document may be the headline, the action line and one Fixed entry in the user's words. Short notes are still worth publishing, because the people who met the fault are waiting to hear that it has gone.

Who fills in a release notes template?

One person owns the document and several people supply its lines. Whoever finished each item writes its one-sentence note, the known issues come from the release decision, and the owner sorts the lines, writes the summary and checks the action line. On a small team the owner can be the product owner. The Good Docs Project's guide to its release notes template states the rule in a few words: the notes "must have a single owner".

Can release notes be generated from pull requests or commits?

Generated notes make a good first draft and a poor final one. GitHub's Generate release notes button lists the merged pull requests, the contributors and a link to the full changelog, and labels can sort pull requests into categories or leave them out. Pull request titles are written by developers for developers, so each line a user will notice still has to be rewritten as a symptom that is gone or a thing the reader can now do.

How often should release notes be published?

Publish release notes with every release a reader can notice, on the day the change reaches them. A team that deploys several times a day can collect its changes into one set of notes a week instead, which is what Aha! does: its release notes go live every Friday. A predictable rhythm tells readers when to look, and each set keeps its own page so older notes are never overwritten.

Can this release notes template be used in Word, Google Docs or Confluence?

The template is plain text with its headings marked the Markdown way, a # before the headline and ## before each section, so it pastes into any editor. In Word, Google Docs or Confluence, paste it and give the # line and the ## lines heading styles. In a tool that renders Markdown, it can be pasted as it is and the headings appear on their own.

Where should release notes be published?

Publish release notes where a reader who has just noticed a change will look: a link inside the product, next to the version number, leading to a page with a stable address for each release. Readers named in the action line are also told directly, by email or by a notice in the product, since they may never open the notes. Support reads the draft before the release goes live.

More templates

  • Watercolour of a blank paper luggage tag, its loop of burnt orange string trailing across the paper

    Template

    User story template

    A copyable user story template: the As a, I want, so that sentence, plus context, acceptance criteria, out of scope, dependencies, size and sign-off.

    8 fields, explained ·

  • Watercolour of a small wooden box with a slot in its lid and a folded slip of paper half posted into it

    Template

    Website feedback form

    A copyable website feedback form template: the questions to ask, which two are required, optional contact details with consent, and a filled-in example.

    9 fields, explained ·

  • Watercolour of a blank folded sheet pinned to an olive cork square with a burnt orange pushpin.

    Template

    Accessibility statement template

    A free accessibility statement template built on W3C WAI guidance: every field explained, honest conformance wording and a filled example for a fictional shop.

    9 fields, explained ·

Or skip the template and capture the fields automatically.

Environment, console and network attach themselves, on the free plan.

<script src="…/widget.js" data-key="pb_pub_…">