An issue tracker template for website projects, with a filled-in example

An issue tracker template is a shared table with one row per issue on a project: an ID, when and by whom it was raised, the page it concerns, its type, a one-line summary, severity and priority, status, owner, due date, a pointer to the evidence and the resolution. A short list of agreed values keeps the columns filterable, and a weekly review reads the open rows together.

  • Template
  • 5 fields, explained
  • Updated

A website project collects issues from everywhere at once. The client emails a wrong opening time, QA finds a form that sends nothing, the designer spots a cropped photo on a phone, and somebody asks who is writing the alt text. Until they sit in one list, nobody can say how many are open, which ones block the launch, or who is waiting on whom.

Watercolour of an olive wooden abacus with three rods of shaded round beads, one burnt orange, on warm paper.

In the template

  1. Project details
  2. Values to use
  3. Issue log
  4. Closing a row
  5. Weekly review

Issue tracker template, ready to copy

Copy it as it is. There is no email step, and nothing on this page is behind one.

Which version of the artefact to show
# Issue tracker: [project or site]

## Project details
Project, and the site or app it covers:
Environments, with their addresses:
Owner of this tracker (one person):
Who may add rows, and who may change Status:
Review rhythm (when the open rows are read together, and by whom):
Last reviewed:

## Values to use
Type: Bug, Content, Design, Request, Question, Task
Severity, for bugs, content and design issues: Critical, High, Medium, Low
Priority: High, Medium, Low
Status: New, Triaged, In progress, Ready to check, Done, Deferred, Won't fix, Duplicate
Use only these words, so that every column can be filtered and counted.

## Issue log
One row per issue, and one issue per row. Never delete a row: close it with a status and a resolution.
| ID | Raised on, by | Page or screen | Type | Summary | Severity | Priority | Status | Owner | Due | Evidence | Resolution |
|----|---------------|----------------|------|---------|----------|----------|--------|-------|-----|----------|------------|
|    |               |                |      |         |          |          |        |       |     |          |            |
|    |               |                |      |         |          |          |        |       |     |          |            |
|    |               |                |      |         |          |          |        |       |     |          |            |

## Closing a row
Done means the person who raised the issue, or QA, has checked the fix on a named environment and build.
Duplicate names the ID of the row it repeats.
Deferred and Won't fix name who decided, and when.
Who may close a row:

## Weekly review
Date of this review:
Open, by status:
Raised since the last review:
Closed since the last review:
Past their due date:
Blocking the launch or the next release:
Decisions taken, and who took them:
# Issue tracker: Quayside Theatre website rebuild

## Project details
Project, and the site or app it covers: the rebuild of the Quayside Theatre website by a small agency, going live on 18 November 2026. Ticket sales stay on the theatre's existing box office site, which the new pages link to.
Environments, with their addresses: staging at staging.quaysidetheatre.example, production at www.quaysidetheatre.example from launch day.
Owner of this tracker (one person): Jo, the agency's project lead.
Who may add rows, and who may change Status: anyone on the project adds rows, the theatre's marketing manager included. The owner of a row moves it up to Ready to check. Only the person who raised it, or Sam in QA, moves it to Done.
Review rhythm (when the open rows are read together, and by whom): Tuesdays at 10:00 for half an hour, with Jo, Sam, Tom (developer), Ana (designer) and Priya (the theatre's marketing manager).
Last reviewed: Tuesday 20 October 2026.

## Values to use
Type: Bug, Content, Design, Request, Question, Task
Severity, for bugs, content and design issues: Critical, High, Medium, Low
Priority: High, Medium, Low
Status: New, Triaged, In progress, Ready to check, Done, Deferred, Won't fix, Duplicate
Use only these words, so that every column can be filtered and counted. Requests and questions leave Severity empty.

## Issue log
One row per issue, and one issue per row. Never delete a row: close it with a status and a resolution.
| ID | Raised on, by | Page or screen | Type | Summary | Severity | Priority | Status | Owner | Due | Evidence | Resolution |
|----|---------------|----------------|------|---------|----------|----------|--------|-------|-----|----------|------------|
| IT-01 | 12 Oct, Priya | What's on | Bug | Genre filter resets to All after going back from a show page, Safari on iPhone | Medium | Medium | Done | Tom | 17 Oct | Report BUG-12, with steps and a screenshot | Fixed in build 0.8.3. Checked by Priya on staging, 16 Oct |
| IT-02 | 13 Oct, Sam | The Tempest show page | Content | Saturday matinee listed at 2.30pm, the box office says 2pm | Low | High | Ready to check | Priya | 20 Oct | Link to the box office listing | Time corrected by Priya, 19 Oct. Sam to check on staging |
| IT-03 | 13 Oct, Sam | Home page, 390 px wide | Design | Hero photo crops the performers' faces on narrow phones | Medium | Medium | In progress | Ana | 19 Oct | Annotated screenshot in report BUG-14 | |
| IT-04 | 14 Oct, Priya | Every page | Request | Newsletter sign-up pop-up on a visitor's first page | | Low | Deferred | Jo | | Priya's email of 14 Oct | Moved to phase 2 as change request CR-03. Jo and Priya, 15 Oct |
| IT-05 | 15 Oct, Sam | Contact | Bug | Form shows its thank-you message, and no email reaches the box office inbox | High | High | In progress | Tom | 21 Oct | Report BUG-15, with the console error and the failed request | |
| IT-06 | 16 Oct, Ana | Every show page | Question | Who writes the alt text for the production photos? | | Medium | Triaged | Priya | 24 Oct | | |
| IT-07 | 17 Oct, Priya | Home page on her phone | Design | Faces cut off in the big photo | Medium | Medium | Duplicate | Sam | | Phone screenshot sent by email | Duplicate of IT-03. Closed by Sam, 17 Oct |
| IT-08 | 19 Oct, Sam | Every show page | Bug | Book now opens last season's box office page | Critical | High | Triaged | Tom | 21 Oct | Report BUG-17, with steps and the link it opens | |

## Closing a row
Done means the person who raised the issue, or QA, has checked the fix on a named environment and build. On this project that is staging, and the build goes in Resolution.
Duplicate names the ID of the row it repeats, so the person who raised the copy can follow the original.
Deferred and Won't fix name who decided, and when. A deferred request also names the change request that carries it.
Who may close a row: the person who raised it, or Sam. Jo closes duplicates and decisions.

## Weekly review
Date of this review: Tuesday 20 October 2026.
Open, by status: 5. Ready to check 1 (IT-02), In progress 2 (IT-03, IT-05), Triaged 2 (IT-06, IT-08).
Raised since the last review: 5, IT-04 to IT-08.
Closed since the last review: 3. IT-01 Done, IT-04 Deferred, IT-07 Duplicate.
Past their due date: 1, IT-03, due 19 October. Ana expects to finish it on 21 October.
Blocking the launch or the next release: IT-08, because nobody can book from a show page, and IT-05, because enquiries are lost.
Decisions taken, and who took them: IT-08 set to Critical and given to Tom ahead of IT-05, with both due 21 October (Jo). IT-04 stays in phase 2 (Jo and Priya, confirmed).

The template below is that list, sized for one project and a small team: the project details, the agreed values for each column, a twelve-column issue log, the rules for closing a row and a weekly review made of counts. It pastes into Excel, Google Sheets or a Markdown document. The filled-in version is the tracker for a theatre's website rebuild four weeks before launch, with a duplicate, a deferred request, a row past its due date and a critical bug in it.

A row in the tracker is one line per issue, and it points at the full record instead of repeating it. For a bug, that record is a report written with the bug report template: steps to reproduce, expected and actual result, environment and evidence. The glossary entry on bug tracking explains the practice the log supports, and the one on issue vs bug explains why an issue tracker holds requests and questions as well as defects.

What each field is for

Scroll the table sideways for the examples.

Field Why it earns its place Example
Project details The project and the site it covers, the environments with their addresses, one owner, who may add rows and change their status, when the open rows are reviewed, and the date of the last review. The permissions line prevents the commonest dispute about a shared sheet, which is who moved a row to Done. The environments line is what a Resolution cell refers to when it says a fix was checked on staging. Quayside Theatre website rebuild, live on 18 November 2026. Staging and production addresses. Owner: Jo, the project lead. Reviewed on Tuesdays at 10:00.
Values to use The fixed words for Type, Severity, Priority and Status, agreed before the first row is written. A filter on Status finds nothing when one person writes Done, another Fixed and a third Closed. Severity and priority are two lists because one rates the damage and the other the urgency, and the scales match the ones the Notarus board uses. Type: Bug, Content, Design, Request, Question, Task. Status: New, Triaged, In progress, Ready to check, Done, Deferred, Won't fix, Duplicate.
Issue log The tracker itself, one row per issue, in twelve columns: ID, raised on and by, page or screen, type, summary, severity, priority, status, owner, due date, evidence and resolution. The line above the table is the rule that keeps the record honest: rows are closed with a status and a resolution and never deleted, so the history of the project stays in one place. IT-05. 15 Oct, Sam. Contact. Bug. Form shows its thank-you message, and no email reaches the box office inbox. High, High. In progress. Tom, due 21 Oct. Report BUG-15.
Closing a row What each closed status means and who may set it. Done needs a check by the person who raised the issue, or by QA, on a named environment and build, because a fix that nobody checked is only a claim. Duplicate points at the original row, and Deferred and Won't fix name who decided, so a closed row still answers the question somebody will ask about it next month. Done only after Priya or Sam has checked the fix on staging, with the build in Resolution. A duplicate names the row it repeats.
Weekly review optional Counts read off the log at the weekly review: open rows by status, rows raised and closed since the last review, rows past their due date, the rows blocking the launch, and the decisions taken in the meeting. The counts show whether the list is growing faster than it drains. The decisions line is what turns a status meeting into a record somebody absent can read. 5 open, 5 raised and 3 closed since 13 October, 1 past its due date. IT-08 and IT-05 block the launch. IT-08 given to Tom first.

An issue tracker row nobody can act on, and the same row that can be

Not this

12 | homepage broken on phone?? | URGENT | Tom

This instead

IT-03 | 13 Oct, Sam | Home page, 390 px wide | Design | Hero photo crops the performers' faces on narrow phones | Medium | Medium | In progress | Ana | 19 Oct | Annotated screenshot in report BUG-14 |

Both rows describe the same problem on the same day. The first says something is broken on a phone, without the page, the width, the kind of problem or any evidence, and it hands the work to the developer when the fix belongs to the designer. URGENT is the only value in it, and it blends damage with timing. The second row can be filtered, sorted, assigned and checked: the page and the viewport say where to look, the type sends it to the right person, the due date can be chased, and the evidence cell leads to the screenshot.

An issue tracker and a bug report template do different jobs

A bug report is the complete record of one fault: what broke and where, the environment, numbered steps, the expected and the actual result, the severity and the evidence. An issue tracker is the list of every issue on the project, one line each, and a line is too short to hold a report. So the two link up. A bug gets a report, written with the bug report template or captured by a feedback tool, and the tracker gets a row whose Evidence cell names that report. The row carries what the team sorts and filters by: type, page, severity, priority, status, owner and due date. The report carries what a developer needs to reproduce the fault. Copying the steps into the row makes the sheet unreadable and leaves two versions of the same facts to drift apart. Many issues on a website project are not bugs. A wrong date on a show page is a content issue, a request for a pop-up is a change to the scope, and a question about who writes the alt text is a task waiting for an owner. They belong in the same list because they compete for the same people and the same launch date.

The columns of the issue log, one by one

ID is a short, permanent reference such as IT-05, which emails, reports and commit messages can cite. It is never reused, even when a row is closed as a duplicate. Raised on, by records the date and the person, which is who checks the fix later. Page or screen names where the issue lives, as a page name, a path or a viewport, because a website issue without a place cannot be found again. Type sorts the row into one of the agreed values. Summary is one line that says what is wrong and where, written so that it can be told apart from every other row on the same page. Severity rates the damage and Priority the urgency, set separately and often by different people. Status is the row's place in the workflow. Owner is one person, never a team, since a row owned by everyone waits for everyone. Due is the date the owner agreed to, entered as a real date so that the sheet can sort and highlight it. Evidence points at the report, screenshot, recording or email that shows the issue. Resolution says what was done, in which build, and who checked it, or why the row was closed without a fix.

Agreed values keep the issue tracker filterable

Free text in a status column is the quiet failure of shared trackers. One person writes Done, another Fixed, a third Closed, and a filter for open rows misses half of them. The Values block fixes the words before the first row is written, and in a spreadsheet each list becomes a dropdown. The statuses follow the life of an issue. New means nobody has looked at it yet. Triaged means it has a type, a severity, a priority and an owner. In progress means the owner is working on it, and Ready to check means the owner thinks it is fixed and is waiting for the person who raised it, or for QA, to confirm on staging. That separate step is what stops a fix that addressed the wrong cause from being closed. Done, Deferred, Won't fix and Duplicate are the four ways a row closes, and each one leaves a sentence in Resolution. Severity and priority are kept apart because they answer different questions. The wrong matinee time in the filled-in example is Low in severity, since nothing breaks, and High in priority, since customers would arrive half an hour late.

Issue log, issue tracker and issue register name one document

Project managers tend to call this document an issue log, agencies and developers an issue tracker, and some organisations an issue register. The searches for all three are looking for the same table, and the template serves each of them. The useful distinction is with the risk register. A risk is something that might happen, such as the box office supplier changing its booking links before launch, and the register records how likely it is and what would reduce it. An issue is something already happening, such as a Book now button that opens the wrong page today, and the tracker records who is fixing it and by when. When a risk happens, it leaves the register and becomes a row in the tracker. Keeping the two apart stops the tracker filling with worries that nobody can act on, and stops the risk register hiding a problem that is already costing bookings. A change request is the third neighbour: a client request that changes the agreed scope, such as the newsletter pop-up in the example, is logged as an issue, decided at the review and, if it is accepted for later, carried forward as a change request named in its Resolution.

Setting up the issue tracker template in Excel or Google Sheets

Copy the issue log block, paste it into the first column of an empty sheet, and split it into columns on the vertical bar: in Excel the command is Text to Columns on the Data tab, with the bar as a custom delimiter, and in Google Sheets it is Split text to columns on the Data menu, with a custom separator. Delete the row of dashes under the header and the empty first column that the leading bar leaves behind. Put the Project details, Values to use, Closing a row and Weekly review blocks on a second tab. Then turn each list in Values to use into a dropdown with data validation, which both programs offer on the Data menu, so the Type, Severity, Priority and Status columns only accept the agreed words. Freeze the header row, add a filter to it, and add a conditional formatting rule that colours a row when its Due date is earlier than today and its Status is still open. Enter dates as dates, never as text, or the rule and the sort will both misread them. Share the sheet with edit rights for the team and the client, and use the version history to trace a row changed by mistake.

Running the weekly review from the tracker

The tracker is only current if someone reads it on a fixed rhythm. A weekly review of half an hour, with the project lead, QA, a developer, the designer and the client's contact, is enough for most website projects. Start with the rows still marked New and give each one a type, a severity, a priority, an owner and a due date. Then read the rows past their due date and ask what is in the way, and finally the rows marked Ready to check, which are waiting on somebody in the room. Fill in the Weekly review block at the end, as counts. Open rows by status show where the work is stuck. Raised and closed since the last review show whether the list is shrinking, and three weeks before a launch that is the number the client will ask for. Write down every decision with the name of the person who took it, especially a request that was deferred or refused, because that is the line somebody will look for when the request comes back. Between reviews, urgent rows are handled as they arrive. A critical bug on the booking path does not wait for Tuesday. When the project closes, the log is the record a lessons learned review starts from: its counts of rows raised, reopened and found after launch fill a block of the lessons learned template.

When a spreadsheet issue tracker stops being enough

A shared sheet works while one small team owns it and most issues arrive from people who already know how to describe them. It strains in predictable places. Evidence lives in email threads and chat, so the Evidence column fills with references nobody can open. Two people edit the same row at once. The client asks for an update by email because they cannot tell what changed in the sheet since last week. Reports arrive without the browser or the page, and somebody has to go back and ask. At that point a board built for feedback does the same job with less upkeep. On the Notarus board, reports filed through the widget land in the first status, Received, with the evidence the widget captured already attached, such as an annotated screenshot, console errors, failed requests and the browser context. The pipeline is Received, WIP, QA and Done by default, and the statuses can be renamed and reordered per project. Severity, on a scale from low to critical, and priority, from low to high, are separate fields with separate filters, and each ticket takes an assignee, labels and a due date. Archiving is reversible and never deletes media or comments, CSV export is included on every plan, and a reporter can follow the status from their portal link instead of asking. A common way to switch is to finish the open rows in the sheet and send new reports to the board from an agreed date.

Common questions

How do you create an issue tracker?

Start by agreeing the values: the types of issue, a severity scale, a priority scale and the statuses a row can take. Then build a table with one row per issue and columns for ID, date and reporter, page, type, summary, severity, priority, status, owner, due date, evidence and resolution. Name one owner for the tracker and set a weekly review, or the list goes stale within weeks.

How can I create an issue tracker in Excel?

Paste the issue log from this template into the first column of a sheet and use Text to Columns on the Data tab, with the vertical bar as the delimiter. Delete the row of dashes, add data validation dropdowns for Type, Severity, Priority and Status, freeze and filter the header row, and add a conditional formatting rule for rows whose due date has passed.

What is the difference between an issue log and a risk register?

An issue log records problems that are already happening and who is fixing them. A risk register records things that might happen, how likely they are and what would reduce them. When a risk materialises, it moves from the register to the log as an issue with an owner and a due date.

What is the difference between an issue tracker and a bug report?

A bug report is the full record of one fault, with steps to reproduce, the expected and actual result, the environment and the evidence. An issue tracker lists every issue on the project, bugs and everything else, one line each. Each bug row points at its report in the Evidence column, and neither document repeats the other.

Should the client be able to edit the issue tracker?

Clients should be able to add rows and comment, since many issues on a website project come from them. Moving a row to Done is better kept to the person who raised the issue or to QA, after checking the fix on staging. Write those permissions into the Project details block so nobody has to argue about them later.

What statuses should an issue tracker use?

Four open statuses and four closed ones cover most projects: New, Triaged, In progress and Ready to check, then Done, Deferred, Won't fix and Duplicate. Ready to check is the easiest one to skip, and it is where the fix is confirmed by somebody other than the person who made it.

What is the best free issue tracking software for a website project?

For one project and a small team, a shared spreadsheet built from this template costs nothing and is enough. A dedicated tool earns its place when reports come from people outside the team, when the evidence keeps getting lost in email, or when the client wants to follow progress without asking. At that point, choose a tool that captures the page, the browser and a screenshot with each report.

More templates

  • Watercolour of a single hairline crack across a pane of glass, the wash pooling dark along the fracture

    Template

    Bug report template

    A copyable bug report template with the fields that decide whether a report can be acted on: environment, steps, expected against actual, evidence.

    8 fields, explained ·

  • Watercolour of a pale wooden clipboard holding a blank sheet beneath a burnt orange clip, with a soft olive shadow.

    Template

    Bug report form

    A copyable software bug report form for clients and testers: plain questions with help text, which answers are required, a team-only block, a filled example.

    14 fields, explained ·

  • Watercolour of a seedling with two pale olive leaves, fine grey roots, a burnt orange taproot and soil crumbs.

    Template

    Root cause analysis template

    A root cause analysis template for software bugs: problem, timeline, five whys, fishbone, root cause, owned actions, and proof that the fix worked.

    8 fields, explained ·

Or skip the template and capture the fields automatically.

Environment, console and network attach themselves, on the free plan.

<script src="…/widget.js" data-key="pb_pub_…">