Alpha vs beta testing

Alpha testing and beta testing are the two forms of acceptance testing that put a near-finished product in front of people outside the development team. Alpha testing happens at the developer's own site, in an environment the team controls. Beta testing happens at the users' own locations, on their devices and networks. Alpha usually comes first, and a beta can run without one.

The longer version

The line between the two is place, and the ISTQB draws it in so many words. Its 2018 Foundation Level syllabus says alpha testing "is performed at the developing organization's site, not by the development team, but by potential or existing customers, and/or operators or an independent test team", and that beta testing is performed by customers or operators "at their own locations". The same section adds that beta testing may come after alpha testing or without any alpha at all. A second sense of the words causes most of the confusion in articles on the subject. In the release life cycle described by Wikipedia, alpha is the first phase of a build, tested first by its own developers, often with planned features still missing, and beta begins once the build is feature complete. Pages that call alpha testing white-box testing by developers are describing that stage. As a form of testing, alpha excludes the people who wrote the code, which is what makes it worth running.

Set side by side, the two differ on six points. Testers: alpha uses staff from outside the build team, an independent test team or invited customers, and beta uses customers or operators who volunteered or were invited. Environment: alpha runs on infrastructure the team controls, and beta on whatever the tester has, old browsers, slow networks and browser extensions included. Build: an alpha build is expected to have defects and known gaps, and a beta build is one the team believes is nearly ready. Findings: alpha finds what a first real user would hit, in front of a team that can watch it happen, while beta finds defects tied to conditions the syllabus calls difficult for the development team to replicate. Feedback: alpha testers can be asked a follow-up question in the corridor, and beta volunteers often never answer one. Outcome: neither ends in a sign-off. Both end in feedback, which is the line between them and user acceptance testing.

On a website or web app with outside users, the alpha is usually a review of the staging site by people who did not build it. Support staff, a salesperson or a few invited customers get a fresh account, realistic data and a task, such as signing up and placing a first order, and they report what stops them. The beta moves to production. A closed beta lets an invited group in, often through a beta flag, a feature flag switched on only for the people who opted in, with a visible label so they know what they are looking at. An open beta or a soft launch takes the product live without an announcement and watches what arrives. A phased rollout is a neighbour with another purpose: it exposes a release to growing shares of traffic to limit damage, and nobody in it has agreed to report anything. A brochure site built for one client needs neither stage, since that client reviews staging through user acceptance testing and signs it off.

The version names follow the same order. An alpha version is the earlier and rougher of the two, and a beta version is closer to release, so a beta is usually the better choice for anyone deciding which to install. After beta, Wikipedia's life cycle names the release candidate, a build that ships unless a significant bug appears, and then general availability. An open beta is available to anyone and a closed beta to an invited group. A product that stays in beta for years while it keeps changing is in what Wikipedia calls a perpetual beta, and the label then describes a support promise more than a test.

Common questions

What is the difference between alpha and beta testing?

Alpha testing is run at the developer's site, in an environment the team controls, by people who did not build the product, such as staff from other teams or invited customers. Beta testing is run by customers or operators at their own locations, on their own devices and networks. Alpha finds what a first real user hits; beta finds what only appears in conditions the team cannot replicate.

What comes first, alpha or beta testing?

Alpha testing comes first when a release has both, since a build should survive people at the developer's site before strangers see it. The 2018 ISTQB syllabus also says beta testing may occur without any preceding alpha, and a small web product often goes straight to a closed beta for its first outside users.

Is an alpha or a beta version better?

A beta version is usually the more stable of the two, because it is the later build: feature complete, past internal testing and believed nearly ready. An alpha version is earlier, expected to have defects, and may lack planned features. Anyone choosing between them for real work should take the beta, and anyone wanting to shape the product early should ask for the alpha.

Are developers alpha testers?

Developers test their own early build in the release-stage sense of alpha, and some articles call that alpha testing. In the ISTQB sense, alpha testing is done at the developing organisation's site but not by the development team. Testers who wrote the code route around its weak spots, which is why the definition leaves them out.

Is beta testing the same as user acceptance testing?

Beta testing and user acceptance testing are separate forms of acceptance testing in the ISTQB list. UAT asks the business or the intended users whether the system is fit for use, and ends in a sign-off by a named person. A beta asks volunteers to use a near-final product in their own conditions, and ends in feedback with no sign-off.

What does alpha and beta testing look like for a website?

For a website or web app with outside users, the alpha is a review of the staging site by people who did not build it, working through realistic tasks with a fresh account. The beta is on production, either behind a beta flag for invited users or as a quiet soft launch. A site built for a single client is reviewed through UAT instead.

What comes after beta testing?

After beta, the team fixes the defects that block release and builds a release candidate, a version that ships unless a significant bug appears. General availability follows. Beta reports that were deferred go into the backlog with an owner, and testers are told what changed because of what they reported.

Bug reports that arrive ready to triage.

Collect replay, console, network and browser context with the Free plan.

<script src="…/widget.js" data-key="pb_pub_…">