Bug triage is a decision per ticket, not a meeting

A bug triage process that reproduces, classifies and hunts for evidence in the room runs longer every week. Triage decides; everything else happens before it.

Three glass funnels descend into separate cups, with the center decision path glowing orange

A weekly triage meeting that runs longer and decides less is doing work that belongs before it. Reproducing a ticket, arguing whether it is a bug, and hunting for the browser it happened in are all preparation, and a room full of engineers is the most expensive place to do any of them. Triage is one decision per ticket.

What the room spends its hour on

Sit in the meeting with a stopwatch and sort what happens by kind. Most of it is one of five activities, and only two of them need the room.

What happens in the roomWhat it isWhere it belongs
“Can anyone reproduce this?” followed by somebody trying, liveReproductionBefore the meeting, by whoever queues the ticket, from the evidence on it
“Is this even a bug, or is that how it works?”ClassificationProduct, in writing, before the ticket is queued
“How bad is it?” argued from memory of the reportSeverityA written scale applied by whoever queues the ticket
“Who takes it?”AssignmentThe room
“This sprint or next?”PriorityThe room

The first three rows are where the hour goes, and none of them is a decision the room is uniquely able to make. Reproduction needs a browser and the conditions the bug happened in, which a group discussion supplies worse than a ticket does. Classification needs somebody who owns the product’s intended behaviour, who may or may not be in the room and in any case should not be deciding under time pressure with six engineers watching. Severity needs a scale and the evidence, and a scale applied in the room is a scale re-argued every week.

The last two rows are the meeting. Assignment and priority need the people who will do the work and the person who owns the sprint, at the same time, looking at the same list. That is a short meeting when it is only that.

Every ticket leaves with exactly one of three outcomes

Bug triage is a sorting decision, and a sorting decision has a fixed set of bins. Three are enough, and the discipline is that every ticket goes into one of them before the next ticket is opened.

Accepted: the ticket is a reproducible defect with a severity already set, and the room gives it a priority and an owner. It moves into the working life cycle and nobody discusses it again until it comes back for verification.

Rejected: the ticket is a duplicate, a request rather than a defect, or a behaviour product has confirmed as intended. The reason is written on the ticket in a sentence a reporter could read, because “closed” with no reason is how the same report gets filed again next month.

Sent back: the ticket lacks something the decision needs, and the ticket names what. Never “needs more info”, which is a rejection wearing a softer label, but “which browser, and what did the screen show after the click”. The ticket returns to the reporter, or to whoever queued it, and it does not come back to the room until the gap is filled.

The third bin is the one teams skip, and its absence is why the meeting reproduces bugs live. A ticket with no send-back option has to be either accepted on faith or rejected on suspicion, so the room does the reporter’s work instead, on the clock, with everybody watching.

A ticket arrives ready or it does not arrive

If sending back is allowed, the next question is what “ready” means, and it needs to be written where the reporter can see it before they file. The minimum is short: what was expected, what happened, the steps taken, and the conditions, meaning the browser and its version, the viewport, the route, and what the console and the network were doing in the seconds before.

The conditions are the half the reporter cannot supply. A tester on the team can be trained to include them; a client or a support colleague forwarding a customer’s complaint cannot, and a readiness rule they cannot meet will be waived on the first busy week. The way past that is to have the page under test supply the conditions itself. With evidence capture a report filed from the page carries the browser and viewport, the page path, and the console and network activity from before the click, so the readiness rule is met by the page rather than waived for the reporter, and the room is left with nothing to reproduce live.

Severity belongs in the same pre-meeting step. A written scale of severity levels, applied by whoever queues the ticket, means the room inherits a severity and argues only if it disagrees. Disagreement is rare when the scale is specific, and when it is common the fix is to rewrite the scale, once, rather than to relitigate it weekly.

The meeting that is left

Strip out reproduction, classification and severity and what remains is a list of tickets with evidence and a severity, each needing an owner and a slot. That is a meeting that can be run standing up, and often the point of describing it is to notice that it need not be a meeting at all: the lead can assign and prioritise asynchronously, on the board, and gather people only for the tickets where the slot is contested.

What has to stay synchronous is the contested slot. Two engineers who both want the same bug, or neither of whom wants it, and a sprint that cannot hold both of the bugs two customers have been promised: those are conversations, and they are short when they are the only thing on the agenda. The queue itself lives on the board, in the column reports arrive in, and a triage decision is a move out of that column carrying the severity and the priority the room settled.

A ticket with evidence but no reproduction is accepted

One class of ticket breaks the three bins, and the process has to say what happens to it rather than letting it circle. An intermittent defect, of which the heisenbug that vanishes under a debugger is the extreme case, carries evidence, a console error, a failed request, a replay showing the click, and still cannot be reproduced on demand by anybody. Sending it back asks the reporter for something they already gave. Rejecting it discards evidence of a real failure. Accepting it hands an engineer a ticket with no known starting point.

Some fraction of real defects will only ever be seen in the evidence and never on an engineer’s machine, no tool changes that, and the send-back loop has to have an exit for them. The workable rule is that a ticket with evidence but no reproduction is accepted at the severity the evidence shows, with a bounded investigation attached: an engineer reads the evidence, forms a hypothesis, adds a guard or a log, and the ticket waits for the next occurrence rather than for a reproduction. That is a decision, made once, with an owner, which is what triage was always supposed to be.

Common questions

What is a bug triage process?

A bug triage process is the set of steps that take a newly filed report to exactly one of three outcomes: accepted with a severity, priority and owner; rejected with a written reason; or sent back naming what the decision needs. Reproduction, classification and severity happen before the decision, so the decision itself is short.

Why does our triage meeting keep getting longer?

Because the meeting is doing preparation in the room: reproducing tickets live, arguing whether a behaviour is a bug, and reconstructing which browser a report came from. None of those needs a group. Moving them before the meeting, and allowing a ticket to be sent back, leaves only assignment and priority for the room.

Does the product owner need to be in the bug triage meeting?

The product owner is needed for classification, meaning whether a behaviour is a defect or intended, and that is better done in writing before the ticket is queued than under time pressure with the engineers watching. The room itself needs only the people who will own the fixes and the person who owns the sprint, because assignment and priority are the decisions it makes together.

What information should a bug report have before triage?

What was expected, what happened, the steps taken, and the conditions: browser and version, viewport, the route, and the console and network activity from the seconds before. The conditions are the half a reporter usually cannot supply, so the page under test should attach them when the report is filed.

How often should bug triage happen?

The decision on each ticket happens when the ticket arrives ready, rather than waiting for a weekly clock. Once reproduction, classification and severity happen before the decision, a lead assigns and prioritises on the board as tickets come in, and a weekly meeting can stay for the tickets where two engineers or two customers want the same slot, which is the contested case the room exists for.

What do you do with a bug that cannot be reproduced?

If the bug carries evidence, meaning a console error, a failed request or a replay, accept it at the severity the evidence shows and attach a bounded investigation: read the evidence, form a hypothesis, add a guard or a log, and wait for the next occurrence. Sending it back asks the reporter for what they already gave.

The Notarus team

The people who build Notarus. We write up the decisions behind the product when the reasoning is worth more than the changelog line.